Close
Search
Filters
Cure It's F300 300mm Flat Flashing can be used as a continuous flashing under slates at a roof junctions or can be used as a gutter lining.
Manufacturer: Cure It
Availability: 4 in stock
SKU: 100513

Cure It's F300 300mm Flat Flashing can be used as a continuous flashing under slates at a roof junctions or can be used as a gutter lining.

The F trim is a flat flashing, which can be used as a lay board at the intersection of a pitched roof and flat roof often found on dormers and to fabricate gutters in situ.

The F trim should not be laminated over completely as it may crack. It is nailed or stapled to the deck and bent up the roof slope. In this situation, the F trim also acts as an expansion facility and must only be fixed to the deck along the bottom edge.

There are many other applications for the F trim including vertical details where laminating would be time consuming, under the feet of air conditioning units to enable re-roofing without disconnecting and use on some parapet wall details etc. The trim should be nailed to the deck around its edges and bandaged over any joins or nail penetrations. Any unlaminated trim can be top coated with the rest of the roof. Laminate onto the mat side only.

Cure It's F300 300mm Flat Flashing can be used as a continuous flashing under slates at a roof junctions or can be used as a gutter lining.

The F trim is a flat flashing, which can be used as a lay board at the intersection of a pitched roof and flat roof often found on dormers and to fabricate gutters in situ.

The F trim should not be laminated over completely as it may crack. It is nailed or stapled to the deck and bent up the roof slope. In this situation, the F trim also acts as an expansion facility and must only be fixed to the deck along the bottom edge.

There are many other applications for the F trim including vertical details where laminating would be time consuming, under the feet of air conditioning units to enable re-roofing without disconnecting and use on some parapet wall details etc. The trim should be nailed to the deck around its edges and bandaged over any joins or nail penetrations. Any unlaminated trim can be top coated with the rest of the roof. Laminate onto the mat side only.

Product tags

aaaaaaaa           

          aaaaaaaaaaaaaaaaa

                Laker Builders Merchant © present  |    All Rights Reserved    | Website Design, Hosting & Maintenance by Vital-tel.com

aaaaaaaaaaPowered by nopCommerce